Kabelstörung 6330 Cham (71CHA). Start:2/1/2023 8:07 PM Assumed duration of disturbance:2/2/2023 4:00 AM
This service is affected:
Service | Impact Description |
---|
BBCS | INC |
Description/ current status: The disturbance has been resolved. Systems/ services function normally again. Location: 6330 Cham ZG. Technical details: Type of net element: DSLAM micro CAN (micro Copper Access Node); Designation: ipd-cg6b710-s-bh-01
ipd-cg5q710-s-bh-01
ipd-cg3u710-s-bh-01
ipd-cg2g710-s-bh-01 Measures: No further measures are planned. |